End-to-end testing of all components once installation is complete, to guarantee optimal functionality.
A meticulous post-installation assessment confirms that each system component adheres to regulatory standards.
This includes checking the functionality of all installed devices, conducting alarm tests, verifying proper communication between control panels and devices, and other systems.
"*" indicates required fields